img

Portfolio

Pipeline Surveys

  • Ruby Pipeline – As-built survey for 295 miles of 42” natural gas pipeline in WY, UT and NV
  • Rock Springs to Wamsutter Overthrust – Design and as-built survey for 78 miles of 36” natural gas pipeline in WY
  • Southern Expansion Main Line 40 – Phase I and II of design and as-built survey for 60 miles of 24” natural gas pipeline in UT
  • Main Line 104 – Design and as-built survey for 80 miles of 24” natural gas pipeline in UT
  • Main Line 122 – Design and as-built for 27 miles of 36” pipeline in WY
  • Rockies Expansion – As-built surveys for 92 miles of 24” and 30” natural gas pipeline
  • Plains – As-built survey for 55 Miles of 16” liquid oil line

Civil Engineering

  • Dr. Haack Site Design (Surgical Center)
  • Brook Hollow Residential Subdivision
  • Everett Graphics Production Plan and Site / Building Development
  • Uinta County School District #1 Horizon Complex Site Design
  • Bear River State Park Flood Damage Rehabilitation and Bear River Bank Stabilization
  • Bear River Drive Extension and Scenic Trail
  • Uinta County Sanitary Sewer and Water Feasibility Study

ILI Support Services

  • Sub-Centimeter Survey and AGM placement for 546 miles located in AL, CA, CO, ID, IL, KS, MO, MN, ND, OK, TX, UT and WA
  • Sub-Centimeter Survey of existing AGM’s for 202 miles AL, CA, CO, ID, IL, KS, MO, MN, ND, OK, TX, UT and WA
  • Tracking – ILI Inspection PIG Tracking for 1,721 miles in AL, CA, CO, ID, IL, KS, MO, MN, ND, OK, TX, UT and WA

Engineering Surveys

  • Uinta County Fort Bridger Airport – Facility / site, topographic survey and construction staking
  • Evanston Burnes Municipal Airport – Facility / site, topographic survey and construction staking
  • Utah Auto Auction – Topographic Survey for site grading and drainage plan
  • Uinta County Child Development Center – Site topographic survey and acquired easements
  • Whitney Canyon Gas Plant – Site and topographic survey for plant reclamation
  • Evanston Regional Hospital – Site and topographic survey for hospital expansion
  • BP America – Facility / site and topographic survey

Material Testing

  • Concrete Slump Testing
  • Concrete Density Testing (unit weight), yield, and air content
  • Making and breaking strength cylinder specimens
  • Jonah Inlet Project concrete testing
  • Uinta Meadows Sidewalk Testing
  • North Elementary, Uinta Meadows and Horizon High School Concrete Testing and Cylinder Breaks

Construction Management and Inspection

  • Uinta County School District #1 Asphalt overlay project and North Elementary Bus lane
  • Bear River State Park Visitors Center and Stabilization Project
  • Bear River Drive Road Extension
  • Urie Fire Station
  • City of Evanston Downtown Sidewalk Improvement Project
  • Uinta County Fort Bridger Road Improvements
  • Evanston Burnes Municipal Airport Maintenance Building

Surveys

  • Saratoga / Eagle Mountain PLSS survey for Right-of-Way creation
  • Scare Canyon, UT Boundary surveys for Pipeline Right-of-Way Documentation
  • Barrick Gold Mineral Surveys & Mining Claims
  • Town of Bear River, WY water line design and construction survey
  • Molycorp “Project Phoenix” QA/QC for construction surveys and site development Mountain Pass, CA
  • Langley Gulch Meter Station Land Acquisition
  • Highway Right-of-Way Surveys for Wyoming Department of Transportation

Power Line Corridor Surveys

  • Springville Substation and Transmission Line Survey
  • Utah Dry Creek Substation Design Survey
  • Page Electric Power line Centerline Survey
  • Denver-Rock Springs Mainline power pole route Survey
  • Eagle Mountain Substation and Transmission Line Survey
  • Nephi City Power 46kv Line Upgrade
  • Bridger Power Plant Survey
img
img
Cook-Sanders Associates, Inc.
Menu